VOLKOVO, MACEDONIA
Wastewater treatment plant Volkovo
CLIENT: Ministry of Environment and proctor, Drezdenska 52, 1000 Skopje, Macedonia
CAPACITY: 20,000 PE
YEAR: 05.2009 - 10.2016, trial operation until 11/10/2016
Manufacture of PGD, PZI, PID project, construction, installation and commissioning of the treatment plant. Supply and installation of electrical and mechanical-technological equipment for ČN Volkovo. Input pumping, aeration SBR pools, sludge storage tank, sludge dehydration, programming and control via a SCADA system.